Solar System 10kw on/off Grid Solar System 1kw-2MW Free Design All-in-One-Procurement

Product Details
Customization: Available
After-sales Service: Yes
Warranty: 30 Years
Still deciding? Get samples of US$ 600/Piece
Order Sample
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory, Trading Company
Secured Trading Service
Diamond Member Since 2020

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
3000000 RMB
Plant Area
1001~2000 square meters
  • Solar System 10kw on/off Grid Solar System 1kw-2MW Free Design All-in-One-Procurement
  • Solar System 10kw on/off Grid Solar System 1kw-2MW Free Design All-in-One-Procurement
  • Solar System 10kw on/off Grid Solar System 1kw-2MW Free Design All-in-One-Procurement
  • Solar System 10kw on/off Grid Solar System 1kw-2MW Free Design All-in-One-Procurement
  • Solar System 10kw on/off Grid Solar System 1kw-2MW Free Design All-in-One-Procurement
  • Solar System 10kw on/off Grid Solar System 1kw-2MW Free Design All-in-One-Procurement
Find Similar Products
  • Overview
  • Product Description
  • Detailed Photos
  • Company Profile
  • Packaging & Shipping
  • Certifications
  • FAQ
Overview

Basic Info.

Model NO.
GKA 1KW-2MW
Condition
New
Certification
ISO, CE, TUV, FCC, RoHS
Application
Home, Industrial, Commercial
Product Name
Solar Power System
System Capacity
1kw-2MW
Solar Panel Type
Grade a Solar Panels
Battery Type
Lithium Batteries/ Lead Acid
Certificate
TUV/CE/ISO
Solar Panel
5W-750W
Inverter
Deye/Growatt/Invt/Megaravo/Thinkpower
Mounting System
Anodized Aluminium Alloy
PV Connector
TUV/CE/ISO
PV Cables
TUV/CE/ISO 4/6/10/25/50/70/150/300mm2
Transport Package
Wooden Pallet Carton Package
Specification
2108*1048*35mm
Trademark
Gamko
Origin
China
HS Code
8541430000
Production Capacity
1.5 Gw Per Year

Packaging & Delivery

Package Size
150.00cm * 110.00cm * 100.00cm
Package Gross Weight
150.000kg

Product Description

Solar System 10kw on/off Grid Solar System 1kw-2MW Free Design All-in-One-ProcurementSolar System 10kw on/off Grid Solar System 1kw-2MW Free Design All-in-One-Procurement
Product Description

GAMKO Energy ON/Off Grid Solar Power System 1KW-2MW
ONE-STOP PROCUREMENT with Free design

SOLAR SYSTEM on grid, off grid, hybrid 
SYSTEM POWER 1KW-2MW
SOLAR COMPONENTS solar panels, solar inverters, solar controllers, AC/DC combiner,
solar cables,solar brackets,install tools and lightening protection,etc.

 

Solar System 10kw on/off Grid Solar System 1kw-2MW Free Design All-in-One-Procurement
SOLAR PANEL
mono solar panel
1.High efficiency A grade solar panel 20-24%
2.Potential induced degradation (PID) resistance
3.Low-loght performance
4.High reliability against extreme environmental conditions
5.12 years product warranty,30 years linear power warranty
Solar System 10kw on/off Grid Solar System 1kw-2MW Free Design All-in-One-Procurement
SOLAR INVERTER( Growatt/Solis/Deye/INVT,etc..)
 
1.Power frequency deisng, applicable for all kinds of loads Ring transformer, low load loss in empty load
2.Perfect protection, safe and reliable
3.Touch screen display,USB output, SPD function
4.Built-in MPPT controller
Solar System 10kw on/off Grid Solar System 1kw-2MW Free Design All-in-One-Procurement
AC COMBINER
 
 
1. Two sets of indepent pv array input/output
2. Flexible application in different connection schemes
3. Protection of high voltage fuse
4. Meet outdooe installation requirements and protect the IP65
Solar System 10kw on/off Grid Solar System 1kw-2MW Free Design All-in-One-Procurement
SOLAR CABLE

Standard tinned copper
CE/TUV certification
Solar System 10kw on/off Grid Solar System 1kw-2MW Free Design All-in-One-Procurement
SOLAR BATTERY (LITHIUM BATTEIRS, GEL BATTERIES AVAILABLE)

Environmental friendly
Widely used in many energy systems, solar, wind,etc
More than 5 years design service life

 

Solar System 10kw on/off Grid Solar System 1kw-2MW Free Design All-in-One-Procurement
CONNECTOR

Rated Voltage: 1000V
Rated Current: 30A IP67
CE/TUV certification
Solar System 10kw on/off Grid Solar System 1kw-2MW Free Design All-in-One-Procurement
BRACKET
 
1.Gound or rooftop mounting system
2.Wind/Snow resistance
3.Vertical or Horizontal
4.Warranty: 10 years
Detailed Photos
Solar System 10kw on/off Grid Solar System 1kw-2MW Free Design All-in-One-Procurement
GAMKO 550W Solar Panels
installed in Ukraine

Solar System 10kw on/off Grid Solar System 1kw-2MW Free Design All-in-One-Procurement

Solar System 10kw on/off Grid Solar System 1kw-2MW Free Design All-in-One-Procurement
GAMKO on grid solar system
installed in Costa Rice

Solar System 10kw on/off Grid Solar System 1kw-2MW Free Design All-in-One-Procurement

Solar System 10kw on/off Grid Solar System 1kw-2MW Free Design All-in-One-Procurement
GAMKO on grid 60kw solar system
installed in Romania

Solar System 10kw on/off Grid Solar System 1kw-2MW Free Design All-in-One-ProcurementSolar System 10kw on/off Grid Solar System 1kw-2MW Free Design All-in-One-Procurement

Solar System 10kw on/off Grid Solar System 1kw-2MW Free Design All-in-One-Procurement
GAMKO hybrid solar system
installed in Italy

Solar System 10kw on/off Grid Solar System 1kw-2MW Free Design All-in-One-Procurement

Company Profile

Solar System 10kw on/off Grid Solar System 1kw-2MW Free Design All-in-One-ProcurementSolar System 10kw on/off Grid Solar System 1kw-2MW Free Design All-in-One-Procurement

Packaging & Shipping

Solar System 10kw on/off Grid Solar System 1kw-2MW Free Design All-in-One-Procurement

Solar System 10kw on/off Grid Solar System 1kw-2MW Free Design All-in-One-Procurement
Certifications

Solar System 10kw on/off Grid Solar System 1kw-2MW Free Design All-in-One-Procurement

CERTIFICATIONS

1.IEC61215, IEC61730, IEC62716, IEC61701, CE, CQC, CGC, ETL(USA),
 JET(Japan), J-PEC(Japan), Kemco(South Korea), KS(South Korea), MCS(UK),
 CEC(Australia), FSEC(FL-USA), CSI Eligible(CA-USA), Israel Electric(Israel),
 InMetro(Brazil), TSE(Turkey)
2. ISO9001:2008: Quality management system
3. ISO14001:2004: Environmental management system
4. OHSAS18001:2007: Occupational health and safety management system
FAQ

FAQ

1.Many people in the market offer 10% cheaper than you, why should I choose your company? Can you do the same price?

As a matter of fact, the factories in some areas of China are really 10% or even more cheaper than us, but even with such a cheap price, their profit is still higher than ours, the main reasons are:

(1) Their procurement cost of solar cells is low. They always use reverse current and low-efficiency solar cells and never do Flash and EL testing at all. Although the appearance after production is not big difference with A grade solar panels, but the problem of cell cracks and mixed cells of different grades are serious. This is the main cause of the hot spot effect, which can lead to fires.
During the production process, GAMKO has 3 EL tests and 2 Flash tests, which from the string welding machine, intermediate inspection, and final inspection to avoid hidden cracks in the solar cells and the solar cells mixed different grades.

(2)Some factories are poorly equipped and staffed mostly by old people, which will reduce the cost of production, but the consequence is that even if the best materials are used, there's no stable equipment, only relying on manual welding, handling and gluing, which will cause hidden cracks, chipping edges, missing corners, and insufficient glue of the solar panels. All these will affect the efficiency and use life of solar panels. A large number of second-hand panels in the market come from those unqualified factories.


2. It's my first time purchase in China, I'm worried about the security of my payment. I'm worried about not being able to deliver on time. I'm worried that the goods I receive are much less than what I expect, and there is no return channel.

Our regular payment is 30% in advance and 70% before shipment, we accept third party inspection before shipment. We also accept LC at sight. For some countries, we accept 30% prepayment and 70% payment against copy of bill of lading.
In addition, we also opened the STS payment method of Made-in-China. Customers pay to a third party company, such as Made in China, and we can only receive the payment after we submit the bill of lading and other shipping documents after shipment.

3. Can I arrange personnel to stay in the factory or inspect the goods before shipment, and then pay the final payment after passing the inspection?
Yes, our customers often use BV, SGS and other third-party companies to carry out on-site testing and inspection services. Our company will fully cooperate with the third-party company, We hope to form a long-term and stable cooperative relationship in the case of customer recognition.
Besides, for the value of goods exceeding two containers, we will bear the inspection cost of the third-party company.
For some countries that need CQC certification, we will also cooperate to provide.


4. If the solar panels have problems after 10 years, how can I apply for compensation?
First of all, we will provide warranty and flash test report with product barcode when we ship out.

During the warranty period, you can submit the claim sheets with the flash test report and warranty, we will provide after-sales service.

5. Why are some tier1 solar panels very cheap? There are many trading companies selling tier1 solar panels.
There are a lot of fake solar panels in the spot market. Customers can't get the warranty after purchasing, and even they have to face a high fine of 2-5 times the value of the goods due to the lack of export authorization, the goods will be confiscated in the customs.
A large number of branded solar panels with quality problems that need to be destroyed, flow into the market at low prices. Customers who buy from unqualified and unauthorized traders will bear all the risks after purchase.
Solar panel power decays with the passage of time. After a long time, due to the poorer stacking sites, stock solar panels have a greatly reduced service life and power.


Without export permit from original factory, all brands solar panel or brands solar
inverter are fake items, no warranty no power guarantee.


6. Can you provide PV system design and package sale service of the whole system? Can you provide installation guidance and door-to-door installation service?
Yes, we have professional engineers for preliminary design on grid,off grid and hybrid systems, but the largest system, we have designed overseas is 1.27MW. If there is a larger system, we suggest that the customer can seek the design of the local power company, and we will provide quotations according to the material list, and we will provide transportation service to the port.
For the system design, we will provide the data collection form for the customer to fill in, including land information, grid voltage, etc. During the quotation process, we will also provide the bracket drawings for the customer's reference.
For the installation part, our company can provide remote and online guidance service. At present there is no door-to-door installation service.

7. Why do some companies offer extra cheap shipping, are there any hidden fees?
If it is a full container, there is no hidden fee.
If it is LCL, the shipping company can choose not charge or charge less at the port of departure, and most part or all of the charges will be collected at the port of destination. In order to avoid the hidden charges, we suggest our customers to do the FOB terms or CIP terms. Most of the customers will face the uncertainty of the charges of the port of destination if they do the CIF terms, and in the CIP terms, the charges of the port of destination will be borne by the seller, and the buyer will only bear the taxes.

8. Can you provide DDP price? Can we make a lower invoice to reduce the import tariff?
Yes, we can. But in fact, DDP is not cost-effective, because the seller does not much know the destination country's land freight and the tax policy, and can only charge the customer in accordance with the principle of the highest. It is recommended to take the CIP terms. Buyers can find an experienced agent in their own country to help declare tax at the cheapest price, there will be many such agents in port cities.
As for the requirement of low invoice, we can cooperate to do it, but buyers need to consider the risk.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier